Rabu, 29 Januari 2014

Batlle Of Bulge

The Battle of the Bulge (16 December 1944 – 25 January 1945) was a major German offensive campaign launched through the densely forested Ardennes region of Wallonia in Belgium, France and Luxembourg on the Western Front toward the end of World War II in Europe. The surprise attack caught the Allied forces completely off guard and became the costliest battle in terms of casualties for the United States, whose forces bore the brunt of the attack. It also severely depleted Germany's war-making resources.
The battle was known by different names. The Germans referred to it as Unternehmen Wacht am Rhein ("Operation Watch on the Rhine"), while the French named it the Bataille des Ardennes ("Battle of the Ardennes"). The Allies called it the Ardennes Counteroffensive. The phrase "Battle of the Bulge" was coined by contemporary press to describe the way the Allied front line bulged inward on wartime news maps[21][h][22] and became the best known name for the battle.
The German offensive was supported by several subordinate operations known as Unternehmen Bodenplatte, Greif, and Währung. Germany's goal for these operations was to split the British and American Allied line in half, capture Antwerp, and then proceed to encircle and destroy four Allied armies, forcing the Western Allies to negotiate a peace treaty in the Axis Powers' favour. Once that was accomplished, Hitler could fully concentrate on the eastern theatre of war.
The offensive was planned with the utmost secrecy, minimizing radio traffic and moving troops and equipment under cover of darkness. The Third U.S. Army's intelligence staff predicted a major German offensive, and Ultra indicated that a "substantial and offensive" operation was expected or "in the wind", although a precise date or point of attack could not be given. Aircraft movement from the Russian Front and transport of forces by rail, both to the Ardennes, was noticed but not acted upon, according to a report later written by Peter Calvocoressi and F. L. Lucas at the codebreaking centre Bletchley Park.[23][24]
Near-complete surprise was achieved by a combination of Allied overconfidence, preoccupation with Allied offensive plans, and poor aerial reconnaissance. The Germans attacked a weakly defended section of the Allied line, taking advantage of heavily overcast weather conditions, which grounded the Allies' overwhelmingly superior air forces. Fierce resistance on the northern shoulder of the offensive around Elsenborn Ridge and in the south around Bastogne blocked German access to key roads to the northwest and west that they counted on for success; columns that were supposed to advance along parallel routes found themselves on the same roads. This and terrain that favoured the defenders threw the German advance behind schedule and allowed the Allies to reinforce the thinly placed troops. Improved weather conditions permitted air attacks on German forces and supply lines, which sealed the failure of the offensive. In the wake of the defeat, many experienced German units were left severely depleted of men and equipment, as survivors retreated to the defenses of the Siegfried Line.
On 16 December 1944, at 5:30 am, the Germans began the assault with a massive, 90-minute artillery barrage using 1,600 artillery pieces[50] across an 80 miles (130 km) front on the Allied troops facing the 6th Panzer Army. The Americans' initial impression was that this was the anticipated, localized counterattack resulting from the Allies' recent attack in the Wahlerscheid sector to the north, where the 2nd Division had knocked a sizable dent in the Siegfried Line. In the northern sector Dietrich's 6th Panzer Army was held up for almost 24 hours by a single reconnaissance platoon and four U.S. Forward Artillery Observers dug in on a ridge overlooking a key road intersection in the village of Lanzerath. They then assaulted Losheim Gap and Elsenborn Ridge in an effort to break through to Liège and Antwerp.
Heavy snowstorms engulfed parts of the Ardennes area. While having the desired effect of keeping the Allied aircraft grounded, the weather also proved troublesome for the Germans because poor road conditions hampered their advance. Poor traffic control led to massive traffic jams and fuel shortages in forward units.
In the center, von Manteuffel's Fifth Panzer Army attacked towards Bastogne and St. Vith, both road junctions of great strategic importance. In the south, Brandenberger's Seventh Army pushed towards Luxembourg in its efforts to secure the flank from Allied attacks. Only one month before 250 members of the Waffen-SS had unsuccessfully tried to recapture the town of Vianden with its castle from the Luxembourgish resistance during the Battle of Vianden.
To protect the river crossings on the Meuse at Givet, Dinant and Namur, Montgomery ordered those few units available to hold the bridges on 19 December. This led to a hastily assembled force including rear-echelon troops, military police and Army Air Force personnel. The British 29th Armored Brigade, which had turned in its tanks for re-equipping, was told to take back their tanks and head to the area. XXX Corps[m] in the Netherlands began their move to the area on 20 December.[80] The 6th Airborne Division in the UK was ordered to ports for ferrying to France.[81]
Aside from the difficulties in the northern and southern sectors, the German advance in the center was the most successful. Fifth Panzer Army was spearheaded by the 2nd Panzer Division while Panzer Lehr Division came up from the south, leaving Bastogne to other units. The Ourthe River was passed at Ourtheville on 21 December. Lack of fuel held up the advance for one day, but on 23 December the offensive was resumed towards the two small towns of Hargimont and Marche. Hargimont was captured the same day, but Marche was strongly defended by the American 84th Division. Gen. Lüttwitz, commander of the XXXXVII Panzer Corps, ordered the Division to turn westwards towards Dinant and the Meuse, leaving only a blocking force at Marche. Although advancing only in a narrow corridor, 2nd Panzer Division was still making rapid headway, leading to jubilation in Berlin. Headquarters now freed up the 9th Panzer Division for Fifth Panzer Army, which was deployed at Marche.[82]
On 22/23 December the woods of Foy-Notre-Dame were reached, only a few kilometers ahead of Dinant. However, the narrow corridor caused considerable difficulties, as constant flanking attacks threatened the division. On 24 December the furthest penetration was reached. Panzer Lehr Division took the town of Celles, while a bit farther north, parts of 2nd Panzer Division were in sight of the Meuse near Dinant at Foy-Notre-Dame. A hastily assembled Allied blocking force on the east side of the river, however, prevented the German probing forces from approaching the Dinant bridge. By late Christmas Eve the advance in this sector was stopped, as Allied forces threatened the narrow corridor held by the 2nd Panzer Division.[82].

By the time the senior Allied commanders met in a bunker in Verdun on 19 December, the town of Bastogne and its network of 11 hard-topped roads leading through the mountainous terrain and boggy mud of the Ardennes region were to have been in German hands for several days. By the time of that meeting, two separate westbound German columns that were to have bypassed the town to the south and north, the 2nd Panzer Division and Panzer-Lehr-Division of XLVII Panzer Corps, as well as the Corps' infantry (26th Volksgrenadier Division), coming due west had been engaged and much slowed and frustrated in outlying battles at defensive positions up to ten miles from the town proper—and were gradually being forced back onto and into the hasty defenses built within the municipality. Moreover, the sole corridor that was open (to the southeast) was threatened and it had been sporadically closed as the front shifted, and there was expectation that it would be completely closed sooner than later, given the strong likelihood that the town would soon be surrounded.[citation needed]
A German machine gunner marching through the Ardennes in December 1944.
Gen. Eisenhower, realizing that the Allies could destroy German forces much more easily when they were out in the open and on the offensive than if they were on the defensive, told his generals, "The present situation is to be regarded as one of opportunity for us and not of disaster. There will be only cheerful faces at this table." Patton, realizing what Eisenhower implied, responded, "Hell, let's have the guts to let the bastards go all the way to Paris. Then, we'll really cut 'em off and chew 'em up." Eisenhower, after saying he was not that optimistic, asked Patton how long it would take to turn his Third Army (located in northeastern France) north to counterattack. Patton replied that he could attack with two divisions within 48 hours, to the disbelief of the other generals present. However, before he had gone to the meeting Patton had ordered his staff to prepare three contingency plans for a northward turn in at least corps strength. By the time Eisenhower asked him how long it would take, the movement was already underway.[87] On 20 December, Eisenhower removed the First and Ninth U.S. Armies from Gen. Bradley's 12th Army Group and placed them under Montgomery's 21st Army Group.[88]
U.S. POWs on 22 December 1944
By 21 December the Germans had surrounded Bastogne, which was defended by the 101st Airborne Division and Combat Command B of the 10th Armored Division. Conditions inside the perimeter were tough—most of the medical supplies and medical personnel had been captured. Food was scarce, and by 22 December artillery ammunition was restricted to 10 rounds per gun per day. The weather cleared the next day, however, and supplies (primarily ammunition) were dropped over four of the next five days.[89]
Despite determined German attacks, however, the perimeter held. The German commander, Lt. Gen. Heinrich Freiherr von Lüttwitz,[90] requested Bastogne's surrender.[91] When Brig. Gen. Anthony McAuliffe, acting commander of the 101st, was told of the Nazi demand to surrender, in frustration he responded, "Nuts!" After turning to other pressing issues, his staff reminded him that they should reply to the German demand. One officer, Lt. Col. Harry Kinnard, noted that McAuliffe's initial reply would be "tough to beat." Thus McAuliffe wrote on the paper, which was typed up and delivered to the Germans, the line he made famous and a morale booster to his troops: "NUTS!"[92] That reply had to be explained, both to the Germans and to non-American Allies.[n]
Both 2nd Panzer and Panzer Lehr moved forward from Bastogne after 21 December, leaving only Panzer Lehr's 901st Regiment to assist the 26th Volksgrenadier Division in attempting to capture the crossroads. The 26th VG received one panzergrenadier regiment from the 15th Panzergrenadier Division on Christmas Eve for its main assault the next day. Because it lacked sufficient troops and those of the 26th VG Division were near exhaustion, the XLVII Panzer Corps concentrated its assault on several individual locations on the west side of the perimeter in sequence rather than launching one simultaneous attack on all sides. The assault, despite initial success by its tanks in penetrating the American line, was defeated and all the tanks destroyed. The next day, 26 December, the spearhead of Gen. Patton's 4th Armored Division broke through and opened a corridor to Bastogne.[93]

Allied counteroffensive

The original objectives are outlined in red dashed lines. The orange line indicates their furthest advance.
On 23 December, the weather conditions started improving, allowing the Allied air forces to attack. They launched devastating bombing raids on the German supply points in their rear, and P-47 Thunderbolts started attacking the German troops on the roads. Allied air forces also helped the defenders of Bastogne, dropping much-needed supplies—medicine, food, blankets, and ammunition. A team of volunteer surgeons flew in by military glider and began operating in a tool room.[94]
By 24 December, the German advance was effectively stalled short of the Meuse. Units of the British XXX Corps were holding the bridges at Dinant, Givet, and Namur and U.S. units were about to take over. The Germans had outrun their supply lines, and shortages of fuel and ammunition were becoming critical. Up to this point the German losses had been light, notably in armor, which was almost untouched with the exception of Peiper's losses. On the evening of 24 December, General Hasso von Manteuffel recommended to Hitler's Military Adjutant a halt to all offensive operations and a withdrawal back to the West Wall. Hitler rejected this.
However disagreement and confusion at the Allied command prevented a strong response, throwing away the opportunity for a decisive action. In the center, on Christmas Eve, the 2nd Armored Division attempted to attack and cut off the spearheads of the 2nd Panzer Division at the Meuse, while the units from the 4th Cavalry Group kept the 9th Panzer Division at Marche busy. As result, parts of the 2nd Panzer Division were cut off. Panzer Lehr tried to relieve them, but was only partially successful, as the perimeter held. For the next two days the perimeter was strengthened. On 26 and 27 December the trapped units of 2nd Panzer Division made two break-out attempts, again only with partial success, as major quantities of equipment fell into Allied hands. Further Allied pressure out of Marche finally led the German command to the conclusion that no further offensive action towards the Meuse was possible.[95]
In the south, Patton's Third Army was battling to relieve Bastogne. At 16:50 on 26 December, the lead element, Company D, 37th Tank Battalion of the 4th Armored Division, reached Bastogne, ending the siege.

On 1 January, in an attempt to keep the offensive going, the Germans launched two new operations. At 09:15, the Luftwaffe launched Unternehmen Bodenplatte (Operation Baseplate), a major campaign against Allied airfields in the Low Countries. Hundreds of planes attacked Allied airfields, destroying or severely damaging some 465 aircraft. However, the Luftwaffe lost 277 planes, 62 to Allied fighters and 172 mostly because of an unexpectedly high number of Allied flak guns, set up to protect against German V-1 flying bomb attacks and using proximity fused shells, but also by friendly fire from the German flak guns that were uninformed of the pending large-scale German air operation. The Germans suffered heavy losses at an airfield named Y-29, losing 24 of their own planes while downing only one American plane. While the Allies recovered from their losses in just days, the operation left the Luftwaffe weak and ineffective for the remainder of the war.[96]
On the same day, German Army Group G (Heeresgruppe G) and Army Group Upper Rhine (Heeresgruppe Oberrhein) launched a major offensive against the thinly stretched, 70 miles (110 km) line of the Seventh U.S. Army. This offensive, known as Unternehmen Nordwind (Operation North Wind), was the last major German offensive of the war on the Western Front. The weakened Seventh Army had, at Eisenhower's orders, sent troops, equipment, and supplies north to reinforce the American armies in the Ardennes, and the offensive left it in dire straits.
By 15 January, Seventh Army's VI Corps was fighting on three sides in Alsace. With casualties mounting, and running short on replacements, tanks, ammunition, and supplies, Seventh Army was forced to withdraw to defensive positions on the south bank of the Moder River on 21 January. The German offensive drew to a close on 25 January. In the bitter, desperate fighting of Operation Nordwind, VI Corps, which had borne the brunt of the fighting, suffered a total of 14,716 casualties. The total for Seventh Army for January was 11,609.[2] Total casualties included at least 9,000 wounded.[97] First, Third and Seventh Armies suffered a total of 17,000 hospitalized from the cold

Tidak ada komentar:

Posting Komentar